House Extensions, illustrative example

House Extensions

House extensions are the project most Preston homeowners ask us about first, and it is easy to see why: a well-planned kitchen-diner or side-return extension changes how a family actually uses a house, without the upheaval of moving.

  • £45,000 to £90,000+
  • 8 to 14 weeks
  • Often not required

Quick Answer

A house extension adds new, permanent floor space to an existing property, most commonly a single-storey rear or side-return extension for a larger kitchen-diner, or a two-storey extension adding a bedroom above. It involves new foundations, brickwork or block-and-render walls, a roof structure, and full connection into the existing house's services and structure.

Illustrative Example

Two Illustrative Finish Styles To Compare

Illustrative style option for house extensions
Illustrative style option for house extensions
Style A, illustrative
Style B, illustrative

Illustrative style comparison, not a photograph of a completed LBW project.

Our Process

  1. 01

    Survey & Design

    We visit your home, measure up, and talk through what you actually need the space to do before a single drawing is done.

  2. 02

    Drawings & Permissions

    We produce scaled drawings and handle permitted development checks or planning applications where needed.

  3. 03

    Foundations & Structure

    Groundworks, foundations, and the structural shell go up, with building control inspections at every stage.

  4. 04

    First & Second Fix

    Roofing, glazing, plastering, then electrics, plumbing, and joinery bring the space to a finished standard.

  5. 05

    Snagging & Handover

    A full walkthrough, snag list, and sign-off before we consider the job done, not before.

The Essentials

Cost, Planning & Timeline

Realistic market-context ranges for Lancashire, not a fixed LBW price list. Every project gets its own free, no-obligation quote.

Typical cost

£45,000 to £90,000+

single-storey rear extensions, depending on size and specification

Planning permission

Often not required

many single-storey rear extensions fall under permitted development if within size limits, though larger or two-storey extensions usually need full planning permission

Typical build time

8 to 14 weeks

on site, from foundations to handover, for a standard single-storey extension

FAQs

Common questions about building with LBW

Call 07549 332889

A house extension adds new, permanent floor space to your existing home, typically a single-storey rear extension for a bigger kitchen-diner or a two-storey extension for extra bedrooms. It involves foundations, a new structural shell, a roof, and full integration into your home's existing services.