LBW Joinery & Building logo
Renovations, illustrative example

Renovations

A kitchen or bathroom renovation is often the project that makes the biggest day-to-day difference to a Lancashire home, and it's one we handle as a single coordinated project, from strip-out to final fit, rather than passing you between separate trades.

  • £10,000 to £40,000
  • 2 to 8 weeks
  • Not usually required

Quick Answer

A renovation is a focused update to a single room or specific area of a property, most commonly a kitchen or bathroom, bringing it up to a modern standard without extending the property's footprint. It typically involves a strip-out, new fixtures and fittings, and finishing works, coordinated as one project.

What It Looks Like

A closer look at the kind of renovations work we take on, and how we approach it from first survey through to the final finish.

Renovated bathroom with large format tiles, walk in shower and a floating oak vanity unit
Bathroom taken back to the joists, re-plumbed, tiled and fitted as one continuous job
Modern bathroom with large format wall tiles, walk-in shower enclosure and contemporary fittings
Full bathroom renovation from strip-out to final tile, one team, one point of contact throughout
Shaker kitchen along one wall of an open plan room with an oak floor
Kitchen supplied and fitted alongside the building work, so there is one team to chase

Our Process

  1. 01

    Survey & Design

    We measure the space and talk through layout, fittings, and finish options with you.

  2. 02

    Specification & Quote

    A written specification and fixed quote, agreed before work starts.

  3. 03

    Strip Out

    Removal of old fixtures, fittings, and finishes down to the shell.

  4. 04

    Fit & Finish

    New plumbing, electrics, tiling, joinery, and fittings installed to specification.

  5. 05

    Snagging & Handover

    Final check, snag list, and sign-off with you before we consider it done.

The Essentials

Cost, Planning & Timeline

Realistic market-context ranges for Lancashire, not a fixed LBW price list. Every project gets its own free, no-obligation quote.

Typical cost

£10,000 to £40,000

for a kitchen or bathroom renovation, depending on size and specification

Planning permission

Not usually required

single-room renovation work is generally permitted development, unless the property is listed or the room's use class changes

Typical build time

2 to 8 weeks

depending on the room and scope of works

FAQs

Common questions about building with LBW

Call 07549 332889

A renovation is a focused update to a single room, most often a kitchen or bathroom, bringing it up to a modern standard. A refurbishment covers multiple rooms or the whole house as one coordinated programme. We handle both with the same team.

Free, No Obligation

Ready To Start Your Project?

Tell us what you have in mind and we will arrange a free site visit, then follow up with a written quote. No pressure, no obligation, just an honest conversation about your project.

Call NowWhatsAppFree Quote